We publish the airtightness test for every project, including the two that missed. The figure below is the as-built result from the final test, not the design target.
- Residential
- Civic

Ashworth Yard
Sheffield · Completed 2024
- Brief
- Nine flats on a former print works, four of them at social rent
- Area
- 1,340 m²
- Fabric
- Reclaimed brick, exposed timber frame
- Airtightness
- 0.42 ach at 50 Pa — target was 0.60
Read the case study →

Carrowmore Library
County Sligo · Completed 2023
- Brief
- A branch library and two community rooms, open seven days
- Area
- 2,180 m²
- Fabric
- In-situ concrete, oak linings, clerestory glazing
- Airtightness
- 0.71 ach at 50 Pa — target was 0.60
Read the case study →
Airtightness figures are as-built results from the final test, witnessed by an accredited tester. Both misses are published with the reasons.