Contract 4417 · span fabrication

A 96-metre span, built in five pieces, and weighed twice before it left the yard.

The bridge replaces a 1911 wrought-iron structure that had been weight-restricted since 2019. The road closure for the lift was booked eighteen months before the first plate was cut.

Plate consumed410 tS355, single mill
Weld deposited1,840 m100% UT on butts
Camber at trial4 mm25 mm allowed
Heaviest lift71 tof five night moves

Mill certificates, weld maps and the ultrasonic reports are kept for the life of the structure and go to the maintaining authority on request.