Six instruments leave the yard on every survey.
Each one is serialised, logged against the job, and recalibrated on a ninety-day cycle. Turn a card to see the tolerance we hold it to.
GNSS rover
Sets the control network before anything else on site moves.
±8 mm horizontal
Tilt-compensated to 30°, logging raw observations at 1 Hz so the fix can be re-derived in post.
Robotic total station
Holds the line where satellites cannot reach — shafts, tunnels, tight urban lots.
±1″ angular
Locks a prism at 800 m and tracks it through the pour. One operator, no rodman.
Terrestrial scanner
Captures the as-built in ten minutes rather than two days.
±2 mm at 40 m
976,000 points per second, registered on site so the crew leaves with a checked cloud.
Digital level
The instrument that settles arguments about settlement.
±0.3 mm per km
Double-run invar staff readings. This is what monitoring reports are built on.
Ground radar
Finds the services nobody drew on the drawing.
40 mm at 1.5 m depth
Dual 250/700 MHz array, swept on a one-metre grid and reconciled against statutory records.
Aerial rig
For the roofs, spoil heaps and quarry faces nobody should walk.
25 mm ground sample
Flown to a PPK base, so volumes reconcile with the ground survey inside 0.4 percent.
Serial numbers and certificates travel with the job file. UKAS traceable.